Case Study
Project Manager controlling at global manufacturer and distributor of leisure equipment
220080
Projektmanager Controlling
Unstable structures and a low level of digitalization and documentation were remedied by implementing digital solutions, simplifying control and approval processes and standardizing calculation methods. These measures led to an improved control capability and a reduction in personnel expenses of 0.5 man-years.
These articles might also interest you: